• This urea plant is rated for 1,000 mt/day capacity. It was built using Stamicarbon technology. The plant was shut down in January, 2009.
• There are two separate trains in this facility with the exception of the prilling area.
• This conventional urea plant utilizes a high pressure synthesis reactor which, followed by two stages of recirculation of unreacted gases.
• The facility is very accessible by road and rail. There is a huge amount of rail system inside the plant. The nearest major port is 120 km away.
• Expected documentation was observed during the inspection, such as PFDs, P&IDs, procedures, and equipment files.
(This plant is part of a Complete Fertilizer Complex, stock #600457)